
Water plant inspection
1. Verify the cleanness and functionality of the solution filter
under the solution tank plug.
2. Check cleanness and sealing of the solution filter.
3. Fill completely the solution tank.
4. Verify the sealing of the hoses, solenoid valve and the
water valve.
5. Verify that the solution, with valve completely open, fall
continuously on the floor.
Kommentare zu diesen Handbüchern