1STEALTHSTEALTH™ ASD20BT ASD20BT20” Automatic Scrubberwith Traction DriveE87028-00E88063-001001 Brown Avenue • Toledo, Ohio 43607-0127 Customer Ser
1011. INSTRUMENT PANEL COMPONENTSThe instrument panel components are identifi ed as follows:A. Levers to activate brushes / traction (located beneath t
11MACHINE PREPARATION15. ADJUSTING THE SQUEEGEE HEIGHTThe height of the squeegee must be adjusted based on wear of the squeegee blade. To do this, tur
1218. SOLUTION TANKRemove the front inlet cap and check the solution fi lter is correctly installed.Check the fi lter cap (beneath the solution tank, at
131. MACHINE OPERATIONA. Connect the battery plug to the machine plug.B. Turn the key (1) of the main switch to the "ON" position (clockwi
142. REVERSE MOVEMENTTo move the machine in reverse push the switch levers (1) forward.WARNING: When moving the machine in reverse, raise the squeegee
151. END OF WORKWhen shutting down the machine and before you perform any type of mainte-nance:A. Turn off the solution control valve (1)B. Raise th
161. CLEANING THE RECOVERY TANKA. Raise the vacuum cover (1).B. Remove the drain hose (2) from it's hook and empty the tank.C. Rinse the insid
174. CLEANING THE SQUEEGEETo clean:A. Remove the vacuum hose from the squeegee shoe adaptor.B. Loosen the knobs (1) at the squeegee shoe adapter.C.
181. CLEANING THE SQUEEGEE HOSEEvery week, or whenever vacuum seems to be unsatisfactory, check the squee-gee hose for obstructions. To clean it:A. R
19INSUFFICIENT WATER ON THE PAD1. Check the valve – located beneath the symbol – (1) is turned on.2. Check there is water in the solution tank.THE M
2TABLE OF CONTENTSRECEIVING THE MACHINE...3 - 4GENERAL SAFETY REGULATIONS ... 5MACH
20BRUSH DECK DIAGRAM
21 BRUSH DECK PARTS LISTING 1 E88272 Brush Deck Splash Guard 1 2 E20073 Brush Deck 1 3 E83970 Bushing 3 4 E83802 Hex Bolt M8x30 Zinc 3
22BRUSH DECK DRIVE DIAGRAM57691195289102512242025272917211334151451519.119.1134259823261618343331252532
23BRUSH DECK DRIVE PARTS LISTING 1 E20011 Motor Mount Plate 1 2 E82312 Bushing 2 3 E83833 Hex Bolt M8x25 Zinc 2 4 E83404 Flat Washer M9x
24SQUEEGEE ASSEMBLY DIAGRAM21311214221618511242423176207151919910830
25SQUEEGEE ASSEMBLY PARTS LISTING 1 E83909 Squeegee Blade, Polyurethane 30" x 1 3/4" x 1/8" 1 2 E12560 Squeegee Blade, Polyurethan
26SQUEEGEE YOKE DIAGRAM
27SQUEEGEE YOKE PARTS LISTING 1 E82279 Spring 1 2 E88279 Micro Switch Sealed 1 3 E20373 Guide Bushing 1 4 E20227 Squeegee Yoke ASM 1 4.
28MAIN FRAME DIAGRAM
29MAIN FRAME PARTS LISTING 1 E82834 Pivot Block 6 2 E81735 Hex Bolt M12x35 Zinc 1 3 E83829 Hex Jam Nut, M12X7 Zinc 1 4 E83550 NyLoc Hex
3Immediately check, when receiving the machine, that all the materials indicated on delivery documents have been received and also that the machine ha
30SOLUTION TANK DIAGRAM1.17.31.71.17.21.111.1231091.151.1691045161.17.11.61.549159714121.181.31.821.41.191.17.31.17.21.171.141.21981311186171.1
31SOLUTION TANK PARTS LISTING 1 E20285 Solution Tank ASM 1 1.1 E88258 Hose, Glass Reinforced 15 OD x 10 ID x 496 L 1 1.2 E20409 Foot Pedal
32RECOVERY TANK DIAGRAM3.53.63.43.7476253.83.98593.33.23.103.13.11.23.11.1101121112131415
33RECOVERY TANK PARTS LISTING 1 E88499 Hose, Vacuum 1 2 E20074 Hinge Pin 1 3 E20354 Recovery Tank ASM 1 3.1 E20189 Fitting, Barbed 1 3.2
34VACUUM UNIT DIAGRAM12.232.142.32.172.112.152.242.22.272.8 2.192.102.92.182.212.12.162.42.62.52.132.742.282.2232.262.252.122.20.42.20.32.20.12.20.22.
35VACUUM UNIT PARTS LISTING 1 E20265 Plate 2 2 E20066 Recovery Tank Cover ASM 1 2.1 E20305 Mounting Ring 1 2.2 E20652 Sound Deadening Foa
36SOLUTION DELIVERY DIAGRAM8
37SOLUTION DELIVERY PARTS LISTING 2 E81035 Solenoid Valve 1 4 E85762 Hose Clamp 2 5 E86275 Barbed Elbow 1 6 E88265 Hose, Glass Reinforce
383.93.103.213.103.993.53.133.203.193.123.43.1143.163.133.143.13.133.123.63.173.73.85783.73.83.113.153.227.527.727.727.127.327.427.827.227.611926.226.
39 1 E20200 Handlebar Housing 1 2 E82351 Key switch 1 2.1 E83316 Key Switch 1 2.2 E83316 Key Switch 1 2.3 E83315 Switch Key 1 2.4 E83
4Rated power HP (W) 1.5 (1100)Working width In (mm) 19.7 (500)Rear squeegee width In (mm) 29.2 (742)Work capacity ft2/h (m2/h) 22,050 (1450)Wa
401.391.191.321.421.431.3.41.3.21.3.3251.3.141.4831.101.231.291.281.351.441.81.161.51.91.451.191.41.171.381.201.401.141.261.191.311.141.251.61.201.131
41 1.1 E20330 Ball Stud M10x22.5 2 1.2 E81597 Circuit Breaker 10 amp, 1/4" Tab Terminals 1 1.3 E82351 Key Switch Assembly w/
42ELECTRICAL DIAGRAM
43ELECTRICAL LISTING 1 E88293 Battery Check Card, Hour Meter 1 2 E82351 Key Switch Assembly w/Keys 1 3 E20646 Chopper Card 1 4 E88266 Rel
44ELECTRICAL DIAGRAM1. ELECTRIC HARNESS INSPECTION1. Verify the functionality and adjustment of the micro switches of the handlebar control.2. Verif
45BATTERY CHECK CARD – HOUR METER1. Verify that turning on the machine the battery check card has the follow-ing starting sequence:• Turning on of t
46VACUUM SYSTEM INSPECTION1. Verify the cleanness and functionality of the fl oat fi lter.2. Check the air sealing of the vacuum unit on the recovery
47BRUSH BASE ADJUSTMENTVerify the right inclination of the brush deck adjust. To adjust the brush deck adjust as follows:• Lower the brush deck to th
48Functional check of the machine Check the functionality of switches. Check the functionality of the switch lever. Check the functionality of the
49MAINTENANCE SCHEDULE Stealth ASD20BTRECOMMENDED SERVICE INTERVALS (HOURS)DAILY50 100 200 400 1,000BATTERIESCheck water level add if necessary DAILY0
5The regulations below must be carefully followed in order to avoid harm to the operator and damage to the machine.• Read all labels on the machine c
52E87028-00 Oct11D1001 Brown Avenue • Toledo, Ohio 43607-0127 Customer Service: 888-GO-BETCO • Fax: 800-445-5056 • Technical Service: 877-856-5
61. HANDLING THE PACKED MACHINEThe machine is contained in specifi c packaging.It is not possible to place more than two packages on top of each other.
73. BATTERY INSTALLATIONThe machine will be supplied with a battery charger and either two 12V Wet or AGM batteries. The batteries must be housed in t
85. BATTERY MAINTENANCEFor maintenance and recharging, follow the instructions provided by the battery manufacturer.6. BATTERY DISPOSALWhen the batter
99. CONNECTING THE BATTERY CONNECTORConnect the battery connector (2) to the machine connector (1)10. BATTERY INDICATORThe battery indicator uses LEDs
Kommentare zu diesen Handbüchern